Arizona Mining Continues Expansion of Taylor Deposit- Intersects 85 Feet of 9.4% Zinc, 12.8% Lead and 3.92 Opt Silver- More Drill Rigs Added

VANCOUVER, June 8, 2016  -Arizona Mining Inc. (TSX:AZ.TO - News) ("Arizona Mining" or the "Company") is pleased to announce the results of three new exploration drill holes targeting the expansion of the  Taylor Zn-Pb-Ag sulfide deposit located on its 100% owned Hermosa Project in Santa Cruz County, Arizona USA. (Photo: http://photos.prnewswire.com/prnh/20160608/376992-INFO)
 
All holes are significant expansions to the maiden resource announced on February 1, 2016 (see Map attached).
HDS-346 intersected several zones of mineralization including 183 feet of 6.2% zinc, 7.6% lead, 0.05% copper and 2.29 opt silver, which included an interval of 85 feet of 9.4% zinc, 12.8% lead, 0.09% copper, and 3.92 opt silver. This drill hole represents a 500 foot step out from the northwestern extent of the previously reported resource area. 
 
HDS-342 encountered 14 individual zones of mineralization including 47.5 feet of 14.1% zinc, 10.1% lead, 0.86% copper and 3.59 opt silver and another of 50.5 feet of 7.8% zinc, 5.7% lead, 0.20% copper and 2.11 opt silver. This hole is an angle hole that targeted the southern limits of mineralization as it extends to the southwest from the main portion of the resource block. 
 
HDS-340 intersected five zones of mineralization including 30 feet of 2.9% zinc; 22.7% lead; 1.09% copper and 9.22 opt silver. This drill hole represents an 800 foot step-out from the northwestern extent of the previously reported resource area. 
 
CEO Jim Gowans commented, "These excellent drill results continue to support our view that the Taylor Deposit is going to grow in size and grade and will rank with some of the world's largest base metal deposits.  We continue to aggressively pursue drilling this project and have increased the number of drill rigs from 5 to 8 to complete the current 125,000 foot program.  The deposit remains open in all directions, and to date we have drilled no blank or even weakly mineralized holes."
 
For a full listing of the drill results for HDS-340; HDS-342 and HDS-346 see Table I below.

Table 1. Assay summaries

DH_ID

 

From (feet)

To (feet)

Interval

(in feet)

From

(meters)

To

(meters)

Interval

(meters)

Ag opt

Pb%

Zn% 

Cu%

HDS-340

 

2062

2082

10

628.5

634.6

3.0

2.08

1.35

0.60

0.11

HDS-340

 

2545.5

2555

9.5

775.8

778.7

2.9

1.62

1.55

2.43

0.05

HDS-340

 

2799

2809

10

853.1

856.1

3.0

1.16

1.49

3.10

0.01

HDS-340

 

3242

3272

30

988.1

997.3

9.1

9.22

22.74

2.95

1.09

HDS-340

 

3427

3437

10

1044.5

1047.5

3.0

0.47

0.98

3.34

0.01

                       

HDS-342

 

500

517

17

152.4

157.6

5.2

0.66

0.57

3.05

0.00

HDS-342

 

557

570.5

13.5

169.8

173.9

4.1

1.45

1.81

2.06

0.11

HDS-342

 

620.5

653

32.5

189.1

199.0

9.9

1.79

0.36

0.37

0.08

HDS-342

 

1650.5

1698

47.5

503.0

517.5

14.5

3.59

10.16

14.15

0.86

HDS-342

 

1806

1820

14

550.4

554.7

4.3

0.98

2.29

3.49

0.24

HDS-342

 

1935

1951

16

589.8

594.6

4.9

1.36

4.01

2.11

0.06

HDS-342

 

1990

2010

20

606.5

612.6

6.1

0.68

1.88

1.45

0.04

HDS-342

 

2211.5

2382

170.5

674.0

726.0

52.0

0.80

1.83

2.39

0.09

HDS-342

Including

2285.5

2333.5

48

696.6

711.2

14.6

1.30

3.19

4.84

0.16

HDS-342

 

2404.5

2455

50.5

732.9

748.2

15.4

2.11

5.70

7.89

0.20

HDS-342

 

2559

2570

11

779.9

783.3

3.4

1.68

2.74

1.45

0.40

HDS-342

 

2589

2624

35

789.1

799.8

10.7

0.85

1.99

1.44

0.04

HDS-342

 

2816

2821.5

5.5

858.3

860.0

1.7

47.73

3.84

2.39

0.55

HDS-342

 

2891

2896.5

5.5

881.1

882.8

1.7

11.55

6.67

4.36

0.27

                       

HDS-346

 

2078

2117

39

633.3

645.2

11.9

1.06

1.18

2.07

0.06

HDS-346

 

2458

2472

14

749.2

753.4

4.3

0.37

1.04

1.77

0.05

HDS-346

 

2699

2882

183

822.6

878.4

55.8

2.29

7.63

6.27

0.05

HDS-346

Including

2730

2815

85

832.1

858.0

25.9

3.92

12.84

9.47

0.09

HDS-346

 

3196

3205.5

9.5

974.1

977.0

2.9

5.77

16.79

9.20

0.95

HDS-346

 

3243

3267

24

988.4

995.7

7.3

2.01

5.52

4.77

0.28

                       

 

(Drill intersections with combined Zinc and Lead>9.0% highlighted. Drill intervals are down the hole drill width but are considered to be within 5% of true width)

Qualified Person

The results of the Arizona Mining Inc. drilling results have been reviewed, verified and compiled byDonald R. Taylor, MSc., PG, Chief Operating Officer for Arizona Mining Inc., a qualified person as defined by National Instrument 43-101 (NI 43-101). Mr. Taylor has more than 25 years of mineral exploration and mining experience, and is a Registered Professional Geologist through the SME (registered member #4029597).

Assays and Quality Assurance/Quality Control 
To ensure reliable sample results, the Company has a rigorous QA/QC program in place that monitors the chain-of-custody of samples and includes the insertion of blanks, duplicates, and certified reference standards at statistically derived intervals within each batch of samples. Core is photographed and split in half with one-half retained in a secured facility for verification purposes.

Sample preparation (crushing and pulverizing) has been performed at ALS Minerals Laboratories, an ISO/IEC accredited lab located in Tucson, Arizona. ALS Minerals Laboratories prepares a pulp of all samples and sends the pulps to their analytical laboratory in Vancouver, B.C. Canada for analysis. ALS analyzes the pulp sample by ICP following a 4-acid digestion (ME-ICP61 for 33 elements) including Cu (copper), Pb (lead), and Zn (zinc).  All samples in which Cu (copper), Pb (lead), or Zn (zinc) are greater than 10,000 ppm are rerun using four acid digestion with an ICP – AES finish (Cu-OG62;Pb-OG62; and Zn-OG62) with the elements reported in percentage (%).   Silver values are determined by ICP ((ME-ICP61) with all samples with silver values greater than 100 ppm repeated using four acid digestion with an ICP-AES finish (Ag-OG62) calibrated for higher levels of silver contained.  Any values over 1,500 ppm Ag triggers a fire assay with gravimetric finish analysis.   Gold values are determined by a 30 gm fire assay with an ICP-AES finish (Au-ICP21).

About Arizona Mining 
Arizona Mining Inc. is a Canadian mineral exploration and development company focused on the exploration and development of its 100% owned Hermosa Project located in Santa Cruz County, Arizona. The Taylor Deposit, a lead-zinc-silver carbonate replacement deposit, has a resource of 39.4 million tonnes in the Inferred Mineral Resource category grading 11% zinc equivalent ("ZnEq") utilizing a 6% ZnEq cutoff grade calculated in accordance with NI 43-101 guidelines. The Taylor Deposit remains open to the north, west and south over land controlled by the Company and will be aggressively drilled to test the limits of the resource. The Company recently completed metallurgical test work on drill core from the Taylor Deposit that projects overall recoveries of 92.9% Pb; 85.5% Zn and 91% Ag using industry standard froth flotation processing technology.  The Company's other project on the Hermosa property is the Central Deposit, a silver-manganese manto oxide development project that has a prefeasibility study completed in December 2013.

Cautionary Note Regarding Forward-Looking Information 
Certain information contained in this press release constitutes forward-looking statements.  All statements, other than statements of historical facts, are forward looking statements including statements with respect to the Company's intentions for its Hermosa Project in Arizona, USA including, without limitation, performing additional drilling on the Taylor Deposit.  Forward-looking statements are often, but not always, identified by the use of words such as may, will, seek, anticipate, believe, plan, estimate, budget, schedule, forecast, project, expect, intend, or similar expressions.

The forward-looking statements are based on a number of assumptions which, while considered reasonable by Arizona Mining, are subject to risks and uncertainties.  In addition to the assumptions herein, these assumptions include the assumptions described in Arizona Mining's management's discussion and analysis for the year ended December 31, 2015 ("MD&A").  Arizona Mining cautions readers that forward-looking statements involve and are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those expressed in or implied by such forward-looking statements and forward-looking statements are not guarantees of future results, performance or achievement. These risks, uncertainties and factors include general business, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in project parameters; changes in costs, including labour, infrastructure, operating and production costs; future prices of zinc, lead, silver and other minerals; variations of mineral grade or recovery rates; operating or technical difficulties in connection with exploration, development or mining activities, including the failure of plant, equipment or processes to operate as anticipated; delays in completion of exploration, development or construction activities; changes in government legislation and regulation; the ability to maintain and renew existing licenses and permits or obtain required licenses and permits in a timely manner; the ability to obtain financing on acceptable terms in a timely manner; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business; and the factors discussed in the section entitled "Risks and Uncertainties" in the MD&A.

Although Arizona Mining has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking information, there may be other risks, uncertainties and other factors that cause performance, achievements, actions, events, results or conditions to differ from those anticipated, estimated or intended.  Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Arizona Mining disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law.

SOURCE Arizona Mining Inc.

Image with caption: "Drill Location Map (CNW Group/Arizona Mining Inc.)". Image available at:http://photos.newswire.ca/images/download/20160608_C5784_PHOTO_EN_709082.jpg

Contact:
Donald Taylor, COO on 520 485 1300, e-mail info@arizonamining.com