Orex Minerals Inc ( REX )
Orex Intercepts 60 Metres Grading 205 g/t Silver on the Sandra Escobar Project in Durango, Mexico
Sandra Escobar Project – 2015-2016 Diamond Drilling Program – Holes 18 to 22 |
|||||
Hole |
From (m) |
To (m) |
Core Length (m) |
True Thick. (m) |
Ag (g/t) FA |
SA-16-018 a |
50.00 |
89.00 |
39.00 |
31.95 |
119 |
Includes |
60.00 |
85.00 |
25.00 |
20.48 |
146 |
Includes |
61.00 |
64.00 |
3.00 |
2.46 |
224 |
Includes |
61.00 |
62.00 |
1.00 |
0.82 |
285 |
SA-16-018 b |
120.50 |
137.00 |
16.50 |
13.52 |
46 |
Includes |
131.00 |
137.00 |
6.00 |
4.91 |
72 |
SA-16-019 |
24.00 |
84.00 |
60.00 |
49.15 |
205 |
Includes |
42.70 |
74.00 |
31.30 |
25.64 |
284 |
Includes |
59.00 |
74.00 |
15.00 |
12.29 |
375 |
Includes |
60.00 |
61.00 |
1.00 |
0.82 |
1,550 |
SA-16-020 |
46.00 |
113.00 |
67.00 |
63.50 |
88 |
Includes |
46.00 |
77.00 |
31.00 |
29.38 |
114 |
Includes |
50.00 |
68.00 |
18.00 |
17.06 |
139 |
Includes |
53.00 |
55.00 |
2.00 |
1.90 |
228 |
SA-16-021 |
44.50 |
75.00 |
30.50 |
28.50 |
110 |
Includes |
49.00 |
74.00 |
25.00 |
23.36 |
116 |
Includes |
49.00 |
62.00 |
13.00 |
12.14 |
132 |
Includes |
52.00 |
53.00 |
1.00 |
0.93 |
184 |
SA-16-022 |
69.00 |
94.00 |
25.00 |
24.00 |
70 |
Includes |
71.00 |
85.00 |
14.00 |
13.44 |
86 |
Includes |
76.00 |
79.00 |
3.00 |
2.88 |
142 |
Includes |
76.00 |
77.00 |
1.00 |
0.96 |
189 |